top of page
Commercial | Mixed-Use
Summod
Project Details:
At Sumood Complex, comprehensive works are being carried out, including concrete, blockwork, and metal works, along with a modern façade and insulation solutions. The project is also equipped with the latest electrical and mechanical systems, offering a unique experience for the end user—whether in the high-standard residential buildings or the fully equipped offices with a distinctive view of King Abdullah Road.
Scope of work:
1. Concrete works
2. Block works
3. Metal Works
4. Facade Works
5. Thermal and moisture Works
6. Finishing Works
7. MEP Works




1/5
Location
Riyadh Province
Industry
Construction
Area
60000
Timing
April 2025 to July 2026
State
Under Construction
Client


1/1
bottom of page