Scope of work
100%
Concrete works
85%
Block works
45%
Metal Works
45%
Facade Works
65%
Finishing Works
60%
MEP Works
85%
Thermal & moisture Works
Latest Update: 2025-12-23
Project Details:
The tower was inspired by pioneering, exploratory design concepts and their bold, unconventional lines, which are embodied in strong, asymmetrical designs that involve amazing hidden balances. The geometry that defies gravity can be observed in the upper part, which offers a unique and unprecedented experience. This tower was designed with an area of 57,200.7 Square meters to meet the needs of every administrative entity and provide a view that motivates employees and investors in particular and aims to achieve the needs of society and future generations in general.
Scope of work:
Concrete works
Block works
Metal Works
Facade Works
Thermal and moisture Works
Finishing Works
MEP Works
Location
Riyadh , King Abdullah Road
Industry
Construction
Area
58195 M²
Timing
18 months
Status
Under Construction
Client
.png)
Commercial | Commercial

















