Scope of work
98%
Concrete works
63%
Block works
0%
Metal Works
0%
Facade Works
21%
Finishing Works
15%
MEP Works
23%
Thermal & moisture Works
Latest Update: 2025-11-04
Project Details:
At Sumood Complex, comprehensive works are being carried out, including concrete, blockwork, and metal works, along with a modern façade and insulation solutions. The project is also equipped with the latest electrical and mechanical systems, offering a unique experience for the end user—whether in the high-standard residential buildings or the fully equipped offices with a distinctive view of King Abdullah Road.
Scope of work:
Concrete Works
Block Works
Metal Works
Facade Works
Thermal and Moisture Works
Finishing Works
MEP Works
Location
Riyadh , King Abdullah Road
Industry
Construction
Area
60000
Timing
April 2025 to July 2026
Status
Under Construction
Client

Commercial | Commercial






